Bank brightens lives of 200 with hydropower

10/20/2011
By Kristy Inus

PENSIANGAN: It used to be annoying for pupils in the remote Kampung Nabawan, near here, to study as they were disturbed by the sound but the noisy generators have since been replaced.About 200 people from 25 homes here can now lead brighter lives thanks to a 3kW micro hydropower generator.Located about five hours' drive from Kota Kinabalu and an hour's boat ride, the riverine village has become the latest remote area in the district to be powered with renewable energy.This is the result of a successful collaboration between the non-governmental organisations, corporate sector and the rural communities there.


The RM89,000 project was funded by CIMB Bank through the CIMB Foundation that channels grants to projects under its Community Link initiative.The project took 10 months to complete in a gotong-royong manner by community members, who received technical support from indigenous people-focused non-governmental organisations (NGOs), namely Tonibung, the Jaringan Orang Asal SeMalaysia (Joas) and Pacos Trust.

Nabawan assemblyman Datuk Bobbey Suan said one of the immediate beneficiaries of the project were children."They can now enjoy a more conducive environment at home to study under better lighting and without the annoying loud noise of a diesel-powered generator set," said Bobbey, who is also Sabah assistant minister of agriculture and food industry, during the launch of the programme.


Project coordinator Adrian Lasimbang said having renewable energy as their source of power had relieved villagers of a heavy financial burden.Previously, they were generating electricity to their homes using generator sets with fuel costs between RM200-RM300 monthly, which was rather an expensive amount for a community of traditional fishermen and farmers."Now, instead of spending money on fuel, they can generate some extra income."Renewable power allows them to keep their fish fresh. They can now fetch a higher price at the local market," said Adrian, who is also the climate change workgroup expert in Joas.


Adrian was previously involved in the setting up of micro hydropower system in three other communities along the Pensiangan River -- namely at Kampung Bantul, Lumpagas and Inakaak.He hopes to replicate similar projects in areas still too remote from the power grid.To date, only about 30 per cent of areas in Pensiangan district is connected to the electricity grid.

( END )

Copyright 2011 New Straits Times Press (Malaysia) BerhadAll Rights Reserved

http://www.power-eng.com/news/2011/10/1524077495/bank-brightens-lives-of-200-with-hydropower.html

Thursday, September 22, 2011

Renewable Energy on the TOP of Borneo

My latest Renewable Energy Project
Harnessing nature's energy at the World Herritage Site
Recently (12-17th September 2011) we installed microsolar solar water heater at Pendant hut, Labanrata Mt. Kinabalu for Mountain Torq Sdn. Bhd. the operator of the world's highest Via Feratta. Highest effciency solar water heater in the world for the highest via ferrata in the world... how about that! .. double world class
During the installation the weather is VERY cold 8-9 deg cel (for someone coming from the tropics) but still the Microsolar can heat water up to 55 deg cel. its steaming hot in this altitude (3,300 m Asl)

Apart from installing 2 units of high efficent evacuated tube Microsolar solar water heater, we also installed 800watt peak of Solar PV to provide electricity for essential loads at Pendant Hut. Solar PV will be combined with small Pico Hydro system as a Solar-Hydro Hybrid in later Phase.
This is the Solar Hydro Main controll panel designed and build by me. The KWh meter will track how much RE power have contributed to the operations of Pendant Hut.
This time rain was very heavy.. swelling up all the usually unseen rivers up in the mountain. in this condition its not safe to install the hydro turbine. too bad we have to KIV the installation of the Pico Hydro system.. anyway a good opportunity to get back up Mt Kinabalu.
The Pico Hydro trubine and its components on "shelf" till the next phase.. when weather is better. once the Solar Hydro Hybrid is commisioned.. pendant Hut will be Autonomous from the ever failing SESB utility Grid at Lanbanrata. Labanrata experiance 4-5 Grid blackouts a day!
More to come.. stay tuned