Saturday, September 15, 2012

Mt Kinabalu Solar hydro Hybrid system.. Renewable Energy on the Summit of Borneo

Have just concluded a week long work at Labanrata Mt Kinabalu located 11,000 ft above sea level. this seems to be the highest Renewable Energy projects in Malaysia. we successfully installed PV Panels and upgraded the intake of the Pico Hydro power system that we installed in March which was damaged during recent floods. was great to work with my team, Haji, Ken and James with John from Mt Torq.


installed GI metal pipes to fasten the poly pipes from the intake to the forebay tanks so that it looks neat and free from air locks.
This is the 2 units of 400gal poly-tank that acts as a forebay and reservoir. we need some reservoir to collect water so that the system can work for few hours during dry season.


installing one of the two intake scoops. very difficult to work on steep and slippery surfaces.. not to mention the icy cold waters of the stream. we have to do lots of improvised approach to tackle the site conditions


the Pico Hydro unit ready to be installed. we included a solenoid valve that will be activated by a float switch at the forebay tank. the solenoid will shut off when tank is empty and opens again when tanks is full. so the system will work automatically during dry season.

in the previous phase, we installed 3 units of evacuated tube solar water heaters. this 3 units is enough to meet the hot water demand for Pendant hut which has maximum capacity of 60pax.

Assembling the panels and installing the Solar PV panels

connecting all the wirings and finishing touches for the installed Solar PV panels on the roof of Pendant Hut



The Main control panel that house the Charge controller and converter to charge the battery bank



The 3kw Inverter and Battery bank that powers the essential load of Pendant hut


Sunday, August 26, 2012

Babalitan Community Micro Hydro is in its final stage

Just came back from Kg Babalitan to supervise the installation of the Micro Hydro Power system for the Murut community in remote district of Pensiangan Sabah. We hope that we can commision the system by Mid September 2012. if everything goes well the 5Kw micro hydro will power up the village of 200 people. the Micro hydro also include a rice mill powered by the turbine.

This project will be the 5th in this district that have been implemented by TONIBUNG with cooperation with NGOs such as PACOS TRUST, JOAS and Aru Bumi Sabah. we hope that this cooperation will continue to bring more community development projects in this area.


Our local champions installing the pipes and valve assembly of the turbine

we are training at least 5 local champions from the community as operators. we just supervise the work, the operators will do most of the installation work. the same 5 oprators will also attend a week long training course at TONIBUNG learning centre ( Innovative Skill Training Centre - ISTC) in Penampang. we also provide exposure program to existing Micro hydro systems.


young and old are involved in the work.. 


wet cement on the concrete floor



assembling and aligning the syncronous generator


a Proud elder from Babalitan posing for the record. i can feel the excitement in the community.


side view of the electromechanical equipment


Reservoir and forebay tanks. multiple 400gal tanks will act as silting basin and reservoir during dry season


Amai Angkong, headman from Kg Silungai with his wide smile.. he is hoping that his village will be next to be electrified by micro hydro power. the community from Kg Silungai have been lending support to community in Kg Babalitan to build this system through Gotong Royong.. we have been getting very good support from the communities that we have implemented the micro hydro projects.


Mr Lawrence and Mr Lo from Ranhill visiting the project site. This project is funded by Ranhill through thier CSR program. we hope Ranhill can lend more support to more micro hydro project in the future.



Wednesday, July 18, 2012

Visit by Prof. Daniel Kammen to Buayan

Last month Nobel Prize laureate and Renewable Energy Guru Prof Daniel Kammen from UC Berkeley visited our community micro hydro project in Kg. Buayan. it was an enjoyable trip.. hiking through the Croker Range.. good time sipping tapioca wine and sigging through the night. Prof Dan gave lots of new ideas on how to further improve the community project.  


Group photo with villagers. Pro Dan (holding Cup)  says the Tapioca wine in Buayan not only taste good.. also have potential for Bio Fuel!!

Prof Dan with Johan from Kg Terian and Ginus our lead operator for Micro hydro in Kg. Buayan 

One for the road!.. some more Tapai with Gabe and Prof Dan.

Thursday, June 28, 2012

Tabin Wildlife Sanctuary

Some images taken during the Pre-feasibility study. planning to go back in sometime in July to conduct the full feasibility study when river is at lowest level.

Si Puntung, one of the Sumatran Rhino at Rhino sanctuary



Micro Hydro potential sites that we will conduct the Feasibility study