Conducted micro hydro assembly trainig for out team at CREATE.
installing Digital Load controller
installing ballast load
Nousi installing cables on the generator
James putting finishing touches on the DLC
Stanis and Louis installing the Ballast load
the turbine and Generator
the Digital load controller
making sure the cables are correct connection
James referring to the schematic diagram